top of page

RPC

MAGNETIC

HYDRODYNAMICS

Якорь 1

Main directions:

Engineering activities concerning designing and commissioning of melting-casting equipment for aluminium alloys production

Fabrication and supply of electrical heating systems for the equipment of metallurgical purposes

MHD devices and technologies of metallurgical purposes

Fabrication of refractory pre-cast shapes for the aluminium industry

Technology of production of wire rod with highly dispersed structure made from special aluminium alloys for aerospace and machine building industries

Modification of working holding furnaces 

At present time RPC Magnetic hydrodynamics Ltd. succesfully implements turnkey projects including designing, fabrication and supply of MHD-stirrers in accordance with Customer's specific requirements. These stirrers are able to be installed on existing holding furnaces as well.

For the first time, in the end of 2011 we implemented complicated project of furnaces modification at Krasnoyarsk Aluminium Smelter — 100 ton capacity tilting electric holding furnaces hearths steelworks reconstruction and reinforcement with additional installation of non-magnetic plate and TYPE 500-2 MHD stirrers installation underneath them in order to improve alloy preparation technology.

In the end of 2012 we successfully implemented the project of 75 ton capacity tilting holding furnaces hearths reconstruction and reinforcement with additional installation of non-magnetic plate and TYPE 400-3 MHD stirrers installation underneath them at Bratsk Aluminium Smelter.

In 2014 we implemented the project of 60 ton capacity tilting holding furnaces hearths reconstruction and reinforcement with additional installation of non-magnetic plate andMHD stirrers installation underneath them at Khakassian Aluminium Smelter.

2011 

2012 

2014 

2012 

In 2012 stationary holding furnaces were modified at Khazahstan Electrolysis Plant OJSC as follows:

- existing silicon carbide heating element were replaced on tubular heating elements of RPC Magnetic hydrodynamics Ltd. production;
- refractory lining was completely changed for monolithic, moreover furnace bath volume increase due to the reduction of lining thickness;
- new design inlet well installation, which helped to decrease a swirling, aluminium splashes and oxidation during its pouring into a furnace from crucibles;
- steelworks modification (including its reinforcement).

 

модернизация

2018

In 2018 we supplied two MHD stirrers with non-sinusoidal power supplies to the Boguchansky Aluminum Plant.

In 2018, the power supply for two off 80-ton and off 30-ton mixers was replaced at the Sayanogorsk Aluminum Plant.

2018

Fabrication of laboratory facilities for vocational education and training institutes of all the levels

Mathematical and physical simulation of electromagnetic, thermal and hydrodynamics processes within metallurgical equipment

bottom of page